1.6 TDI CR engine (EA189) · Mixture preparation – injection · High-pressure pump

High-pressure pump – assembly overview and fastening

Assembly overview – high-pressure pump: drawing 1
  • 1 Ancillary bracket
  • 2 Bolt
    • Qty. 2
    • Renew
    • 20 Nm +180°
  • 3 Hub
    • Use counterhold - T10051- to loosen and tighten.
    • To remove, use puller - T40064-.
  • 4 High-pressure pump toothed belt pulley
  • 5 Bolt
    • Renew
    • Qty. 3
    • 20 Nm
  • 6 Nut
    • 95 Nm
  • 7 Bolt
    • Renew
    • 20 Nm +45°
  • 8 High-pressure pump

⇒ 3.1 Rules for cleanliness

Risk of irreparable damage to high-pressure pump if allowed to run while empty After the high-pressure

pump has been installed, it must be filled with fuel before engine is started ⇒ 1.3 Filling/bleeding fuel system.

  • With fuel metering valve - N290- (do not open)
  • After high-pressure pump or fuel pressure regulating valve - N276- is renewed, learned values have to be re-adapted, see “Guided Functions” in vehicle diagnostic tester.
  • Removing and installing
  • 9 High-pressure line
    • Between high-pressure pump and fuel rail
    • Do not alter shape.
    • Check for damage before re-installing.
    • When renewing high-pressure pump, also renew high-pressure line.
    • Removing and installing ⇒ 3.7 Removing and installing high-pressure lines
    • Lubricate thread of union nuts with clean engine oil
    • 28 Nm
  • 10 Fuel supply hose
  • 11 Fuel return hose

Tightening torques on this page

5 torques

To the drawing ↑

Drawing with the item numbers:

All except 6, 9:Renew

ItemPartTorqueNotes
2Bolt20 Nm +180°Qty. 2
5Bolt20 NmQty. 3
6Nut95 Nm
7Bolt20 Nm +45°
9High-pressure line28 NmBetween high-pressure pump and fuel rail · Do not alter shape. · Check for damage before re-installing. · When renewing high-pressure pump, also renew high-pressure line. · Lubricate thread of union nuts with clean engine oil

All tightening torques in this manual →