1.4 TSI engine (EA211) · Cooling · Coolant pump, regulation of cooling system
Removing and installing electric coolant pump
Special tools and workshop equipment required

- Hose clamps to 25 mm - 3094-

- Drip tray for workshop hoist - VAS 6208-

- Spring-type clip pliers - VAS 6362-
Removing

- Carefully open filler cap -1- on coolant expansion tank -2- in -direction of arrow-.
- Remove noise insulation ⇒ General body repairs, exterior; Rep. gr. 66; Noise insulation.

- Disconnect electrical connector -1-.
- Place drip tray for workshop hoist - VAS 6208- underneath.
- Clamp off coolant hoses on charge air cooling pump - V188- using hose clamps up to 25 mm - 3094-.
- Release hose clip -3- and remove coolant hose.
- Unscrew bolt -2- and remove charge air cooling pump - V188-.
Installing
Install in reverse order of removal. The following should be observed:
- Install noise insulation ⇒ General body repairs, exterior; Rep. gr. 66; Noise insulation.
- Check coolant level ⇒ 1.3 Draining and adding coolant.
Torque settings