Special tools, testers, measuring instruments and auxiliary items required
Torque wrench - V.A.G 1332-
»Carry out the following work sequence«
Removing
- Remove poly V-belt ⇒ 1.5 Removing and installing poly V-belt (vehicles with idler roller).

- Unscrew securing bolt -bottom arrow- from charge air pipe.

- Unscrew coolant line bolts -arrows-.
- Remove air conditioner compressor; do not detach refrigerant lines on air conditioner compressor.
- Refrigerant circuit remains closed.
- Using a suitable tool, suspend air conditioner compressor to body ⇒ Rep. gr. 87; Removing and installing air conditioner compressor.

- Unscrew securing bolt -2-, remove tensioning element for poly-V belt -1-.
Installing
Install in reverse order. During this procedure, observe the following:
- ⇒ Rep. gr. 87; Installing air conditioner compressor
- Specified torques for poly V-belt drive with tensioning element ⇒ 1.2 Assembly overview - poly V-belt drive (vehicles with idler roller and air conditioner compressor).
- Install poly V-belt ⇒ 1.5 Removing and installing poly V-belt (vehicles with idler roller).