1.2 TDI CR engine (EA189) · Crankshaft group · Cylinder block (pulley end)
Removing and installing poly V-belt (vehicles with tensioning element)
Special tools and workshop equipment required

- Locking pin - T10060 A-
»Carry out the following work sequence«
Removing
- Noise insulation ⇒ General body repairs, exterior; Rep. gr. 50; Body - front; Assembly overview - noise insulation.
- Mark running direction of poly V-belt.

- Swing tensioning element in direction of arrow to relieve tension on poly V-belt.

- Align holes -arrows- and lock tensioning element in position with locking pin - T10060 A-.
- Remove poly V-belt.
Installing
- Install in reverse order.
,

- Fit poly V-belt on poly V-belt pulleys.
- 1 Crankshaft
- 2 Tensioning element
- 3 Alternator
- 4 Air conditioner compressor
On completing work:
- Start engine, and check belt running.