# 3.6 Removing and installing fuel rail – 1.6 TDI CR engine (EA189)

> Removing and installing fuel rail, 1.6 TDI on the VW Polo 6R: 15 steps, special tools V.A.G 1331/1 and V.A.G 1331/6, tightening torques and 14 drawings.

- Web page: https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/23-mixture-preparation-injection/removing-and-installing-fuel-rail/
- Original document: https://cdn.polo.blue/files/16-tdi-cr-engine-cayacaybcayc-workshop-manual-2019.pdf
- 23 – Mixture preparation - injection, [1.6 TDI CR engine (EA189)](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/index.md)
- Previous procedure: [3.5 Removing and installing injectors](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/23-mixture-preparation-injection/removing-and-installing-injectors/index.md)
- Next procedure: [3.7 Removing and installing high-pressure lines](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/23-mixture-preparation-injection/removing-and-installing-high-pressure-lines/index.md)

Special tools and workshop equipment required

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/80da8ddb7bc2c8c6.webp)

- Torque wrench - V.A.G 1331- 

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/e22fd9455949f255.webp)

- Ratchet wrench - V.A.G 1331/1-

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/41792bca7a269606.webp)

- Tool insert 17 mm - V.A.G 1331/6-

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/9c4a67259bf9bbf1.webp)

- Socket - T40055-

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/d697b4abe84c0c33.webp)

- Pliers - 3314-

**Removing**

[⇒ 2 Safety information](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/00-technical-data/)

[⇒ 3.1 Rules for cleanliness](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/00-technical-data/rules-for-cleanliness/#t12-146)

- Remove engine cover panel [⇒ 3 Engine cover panel](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/10-removing-and-installing-engine/).
- Unscrew bolt -3- from retainer for high-pressure line.

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/3bbebe1840dcb326.webp)

- Remove fuel high-pressure line -2-. To do this, release union nuts on high-pressure pump -4- and fuel rail -1-.

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/3a3ca60ceb7156ae.webp)

> **Note**
>
> The lifting eye (for engine mounting) must be movable in order to unscrew union nut on high-pressure pump; loosen bolts -4- to do this.

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/4542daf7b758903c.webp)

- Open cable guide fasteners -arrows- to free wiring harness.

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/9cb8c6ac1d337413.webp)

- Position pliers - 3314- with groove -arrow A- on support sleeve shoulder -arrow B-.

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/4a48a58797b07719.webp)

- Carefully pull connectors off glow pin plugs in direction of -arrow-.

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/ebfef2ec8b6fce6c.webp)

- Pull off electrical connectors -1 and 4-.
- Pull off fuel return hose -2-.

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/a02616a638dc1952.webp)

- Disconnect electrical connectors -1, 6 and 7-.

> **Caution**
>
> - Mark allocation of high-pressure lines to cylinders. Injectors must always be re-installed on the same cylinders.
> - Plug open connections with suitable sealing caps immediately.

- Remove high-pressure lines between fuel rail and injectors.

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/1ee7af85e01df68a.webp)

> **Note**
>
> Counterhold on high-pressure union -A- when loosening highpressure line.

- After removal, lay high-pressure lines on a clean cloth.
- Remove fuel rail, first unscrewing the two bolts.

**Installing**

Installation is carried out in the reverse order. When installing, note the following: 

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/64533ddd3a314519.webp)

- Initially tighten securing bolts -arrows- to just max. 1 - 2 Nm.

- It must be possible to move the rail so the hoses can be fitted free of stress.

- Install high-pressure lines [⇒ 3.7 Removing and installing high-pressure lines](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/23-mixture-preparation-injection/removing-and-installing-high-pressure-lines/#t412-380).
- Firmly screw lifting eye in [⇒ 1.5 Removing and installing bracket for ancillaries](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/13-crankshaft-group/removing-and-installing-bracket-for-ancillaries/#t96-309).

> **Note**
>
> - Renew retaining clips.
> - Observe cylinder-specific markings if reusing high-pressure lines.
> - The high-pressure lines may be re-used after the following checks:
> - Check taper seat of respective high-pressure line for deformation and cracks.
> - The inside of the line must be free of deformations, constrictions and damage.
> - Corroded lines should no longer be used.
> - Specified torques: [⇒ 1.2 Assembly overview - fuel system](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/23-mixture-preparation-injection/assembly-overview-fuel-system/#t380-82).

## Tightening torques on this page

### In the steps
| Step | Torque |
| --- | --- |
| Initially tighten securing bolts -arrows- to just max. 1 - 2 Nm. | 2 Nm |
