# 2.3 Assembly overview – charge-air hose connections – 1.6 TDI CR engine (EA189)

> VW Polo 6R (Charge air system), step by step: charge-air hose connections – assembly overview, 1.6 TDI – 20 steps, tightening torques and 9 drawings.

- Web page: https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/21-turbocharging-supercharging/assembly-overview-charge-air-hose-connections/
- Original document: https://cdn.polo.blue/files/16-tdi-cr-engine-cayacaybcayc-workshop-manual-2019.pdf
- 21 – Turbocharging/supercharging, [1.6 TDI CR engine (EA189)](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/index.md)
- Previous procedure: [2.2 Removing and installing charge air cooler](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/21-turbocharging-supercharging/removing-and-installing-charge-air-cooler/index.md)
- Next procedure: [2.4 Checking charge air system for leaks](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/21-turbocharging-supercharging/checking-charge-air-system-for-leaks/index.md)

[⇒ 2.3.1 Hose connections with grooved unions](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/21-turbocharging-supercharging/assembly-overview-charge-air-hose-connections/#t369-180)

[⇒ 2.3.2 Hose connections with plug-in connectors](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/21-turbocharging-supercharging/assembly-overview-charge-air-hose-connections/#t369-626)

[⇒ 2.3.3 Removing and installing charge air pipe hot side](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/21-turbocharging-supercharging/assembly-overview-charge-air-hose-connections/#t370-476)

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/879c7815ad22b5e0.webp)

### 2.3.1 Hose connections with grooved unions

> **Note**
>
> - Check all air hoses and pipes for firm seating and leaks before carrying out tests or repairs.
> - Hose unions and air intake pipes and hoses must be free of oil and grease before installation.
> - Secure all hose connections with the correct type of hose clips (same as original equipment) ⇒ Electronic parts catalogue (ETKA).
> - In order to be able to securely attach the air hoses on their connections, the worm screws of the used hose clips have to be sprayed with penetrating spray before installing.

> **Caution**
>
> The screw-type clips -A- on the charge air lines must always be tightened as specified [⇒ 2.3.1 Hose connections with grooved unions](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/21-turbocharging-supercharging/assembly-overview-charge-air-hose-connections/#t369-476). If the torque is too low or too high, the charge air hose may slip off the corrugated pipe connection or the charge air pipe when the vehicle is used. 

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/4f2ee358e9d857e2.webp)

Installing air hoses with screw-type clips

**Specified torques for**

- **1** Hose clip -a- = 13 mm wide: 5.5 Nm
- **2** Hose clip -b- = 9 mm wide: 3 Nm

## 2.3.2 Hose connections with plug-in connectors

> **Caution**
>
> The seal for the push-on coupling can be damaged if the retaining clip is in the locked position during installation. This would result in leaking. Observe installation instructions.

**Removing**

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/d3c103300f0db1cd.webp)

- Release plug-in connector by pulling securing clip -1-. Pull hose/pipe-2- off without the use of tools.

**Installing**

- If renewed, place seal in groove of charge air hose. Ensure the seal is correctly seated in the groove.
- Lubricate sealing surface and seal with oil.
- Bring retaining clip to release position -1-.
- Push charge air hose into coupling to stop.

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/41d88627ade4eaa6.webp)

- Bring securing clip to locking position -2- and then push charge air hose again.
- Check if plug-in connector seats correctly and is properly engaged by pulling hose.

## 2.3.3 Removing and installing charge air pipe »hot« side

**Procedure**

- Remove engine cover panel [⇒ 3 Engine cover panel](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/10-removing-and-installing-engine/).
- With ignition switched off, disconnect battery earth strap. ⇒ Electrical system; Rep. gr. 27; Battery; Disconnecting and connecting battery
- Remove battery and battery tray ⇒ Electrical system; Rep. gr. 27; Battery; Removing and installing battery.
- Remove air filter housing with air mass meter and connecting pipe [⇒ 7.2.2 Removing and installing air filter housing, Polo](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/23-mixture-preparation-injection/removing-and-installing-air-filter-housing/#t448-678).

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/709f16de74085a5c.webp)

- Loosen clamp -2- on connecting hose to pulsation damper. Unscrew securing bolt -3- from charge air pipe.
- Unscrew securing bolt -arrow- from charge air pipe. Pull connecting hose from pulsation damper as far as possible.

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/e7e253d663b66809.webp)

- Unclip top coolant hose on charge air pipe -arrow-.

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/72388d51203a01bb.webp)

- Unclip wiring harness on charge air pipe -arrows-.

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/c7bd09d715ff3f0b.webp)

- Remove connecting hose -arrow- »hot side«.

![](https://catalog.polo.blue/manuals/vw-polo-engine-ea189-16-tdi-cr/b3c10ed0c235446a.webp)

- Remove securing bolts -arrows- of charge air pipe on »hot side«.
- Remove charge air pipe.

**Installing**

- Install in reverse order. When doing this, observe the following:
- First start all securing bolts on charge air pipe. Then tighten. Specified torque:.

Renew any damaged cable ties and clips.

## Tightening torques on this page

### 2.3.1 Hose connections with grooved unions [To the drawing](https://catalog.polo.blue/repair-manuals/engine-1-6-tdi-cr-ea189/21-turbocharging-supercharging/assembly-overview-charge-air-hose-connections/#2-3-1-hose-connections-with-grooved-unions)
| Item | Part | Torque |
| --- | --- | --- |
| 1 | Hose clip -a- = 13 mm wide: | 5.5 Nm |
| 2 | Hose clip -b- = 9 mm wide: | 3 Nm |
