# 3.1 Assembly overview – plenum chamber bulkhead – Body repairs – exterior

> Plenum chamber bulkhead – tools and materials on the VW Polo V: 2 steps, special tools V.A.G 1939 and V.A.G 1628, tightening torques and 2 drawings.

- Web page: https://catalog.polo.blue/repair-manuals/body-exterior/50-body-front/assembly-overview-plenum-chamber-bulkhead/
- Original document: https://cdn.polo.blue/files/vw-polo-5-2014-body-repairs-exterior-eng.pdf
- 50 – Body - front, [Body repairs – exterior](https://catalog.polo.blue/repair-manuals/body-exterior/index.md)
- Previous procedure: [2.4 Removing and installing wing bracket](https://catalog.polo.blue/repair-manuals/body-exterior/50-body-front/removing-and-installing-wing-bracket/index.md)
- Next procedure: [3.2 Assembly overview – plenum chamber bulkhead](https://catalog.polo.blue/repair-manuals/body-exterior/50-body-front/assembly-overview-plenum-chamber-bulkhead-2/index.md)

![](https://catalog.polo.blue/manuals/vw-polo-2014-body-exterior/26026f6726bf391f.webp)

Special tools and workshop equipment required

- Torque wrench - V.A.G 1331-
- Cartridge heater - V.A.G 1939-
- Hand-cartridge gun - V.A.G 1628-

**Materials**

- 1-pack window adhesive DH 009 100 A2 [1)](https://catalog.polo.blue/repair-manuals/body-exterior/50-body-front/assembly-overview-plenum-chamber-bulkhead/#t25-173) 
- Activator
  D 181 801 A1
- Glass and paint primer D 009 200 02
- Cleaning solution D 009 401 04
- Primer applicator D 009 500 25 

1) Warm according to manufacturer's instructions, using cartridge heater - V.A.G 1939-.

2) Observe minimum curing period [⇒ 1.1 Minimum curing periods for bonded windows](https://catalog.polo.blue/repair-manuals/body-exterior/64-glazing/minimum-curing-periods-for-bonded-windows/#t310-248).

> **Note**
>
> The plenum chamber bulkhead -1- is bolted and also bonded in place with PUR adhesive sealant -3-.

![](https://catalog.polo.blue/manuals/vw-polo-2014-body-exterior/71f03ca8e921cbed.webp)

- **1** Bulkhead
  - Removing:
  - Components that are fastened to the bulkhead must be detached.
  - After unscrewing bolts -2-, cut through adhesive bead -3- using workshop equipment.
- **2** Bolt
  - Qty. 10
  - Specified torque: 25 Nm
- **3** Body flange
- **4** PUR adhesive sealant
  - DH 009 100 03
  - Bead cross section: width = 8 mm; height = 10 mm.
  - Minimum curing period [⇒ 1.1 Minimum curing periods for bonded windows](https://catalog.polo.blue/repair-manuals/body-exterior/64-glazing/minimum-curing-periods-for-bonded-windows/#t310-248).

## Tightening torques on this page

### Torque
| Item | Part | Torque | Notes |
| --- | --- | --- | --- |
| 2 | Bolt | 25 Nm | Qty. 10 · Specified torque |
